Overview
Upgrading FineReport from V10.0 to V11.0 is a cross-version upgrade. This article mainly introduces how to perform the update.
Technical Assistance for the Upgrade
Technical assistance for upgrading FineReport is provided by the technical support team. After contacting the technical support team for introduction about upgrade assessment, you can fill in and submit Upgrade Assessment for us to check your system requirements. After you submit the form, the team will contact you for specific upgrade matters before your expected upgrade time. You can contact your sales manager for confirmation on business issues.
The link to Upgrade Assessment is as follows: Upgrade Assessment.
Preparation Before Upgrading
1. Compatibility instructions: Compatibility Instructions for upgrade (V10.0 to V11.0)
2. For upgrade risk detection, you can contact the technical support team.
3. Preparations before the upgrade: Upgrade preparation of FineReport (V10.0 to V11.0). The summary is as follows:
a. Backing up platform configuration (required)
b. Backing up project files (required)
c. Processing authorization before the upgrade
d. Creating a new table space for the external database before upgrading
Update Methods
You can upgrade FineReport from version 10.0 to 11.0 by the upgrade tool or by deployment.
1. Upgrade through the upgrade tool
It means that you can run the upgrade tool to upgrade the original project. For details, see Upgrade Procedure (V10.0 to V11.0) on Windows and Upgrade Procedure (V10.0 to V11.0) on Linux.
2. Upgrade through deployment
It means that you can directly deploy the system V11.0, and then move the template in the system V10.0 to the newly deployed system V11.0 to upgrade. For details, see Upgrade Procedure (V10.0 to V11.0) Through Deployment.
Troubleshooting After Upgrade
You may encounter some problems after the upgrade. Contact the technical support team.
The Rollback Plan After Upgrade
Contact the technical support team for more details.