You can use the test tube gauge to directly display the progress or actual situation of a certain indicator. The following figure shows the effect.
Chart Type
Dimension
Indicator
Test Tube Gauge
0
1
Advantage: You can use the chart (directly displaying the progress or actual situation of an indicator) to show the progress or proportion.
Disadvantage: You cannot use the chart to analyze data based on time categories, and individual charts cannot be compared for analysis.
1. Log in to the system as the admin, click My Analysis, click a folder, and click New Subject.
2. Click Local Excel and click Upload Data, as shown in the following figure.
Download the sample data:Supplier Product Table.xlsx .
3. After the upload, click OK.
1. Click Add Component in the lower left corner.
2. Click the Gauge icon in Chart Type, select the sixth subtype in Graphic Property, and drag the Stock field into Pointer Value.
Click Style and set the gauge length, as shown in the following figure.
Note:Width cannot be set currently.
Note:For details about setting the color or label, see Chart Color or Chart Label.
On PC
The following figure shows the preview effect on PC.
On Mobile Terminals
The following figure shows the preview effect on the DataAnalyst app and in HTML5.
The steps are the same as those in section "Horizontal Test Tube Gauge," except that you need to select the fifth subtype in Chart Property after selecting Gauge in Chart Type.
1. On PC
2. On Mobile
滑鼠選中內容,快速回饋問題
滑鼠選中存在疑惑的內容,即可快速回饋問題,我們將會跟進處理。
不再提示
10s後關閉
Submitted successfully
Network busy